Measurements taken from the surface of the lead and concrete by using the measuring device were plotted against grids that were shifted at every 10mm intervals. These drawings are showing the construction sequence of the lead formwork and the concrete cast in detail.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment